For automotive suppliers, call-offs change daily, and the extra shifts and premium freight that follow eat into thin margins. Zentio is the agentic manufacturing OS: its agents track the output you lose to stops and scrap, price each extra shift and draft every new sequence for your planners to approve.
Yes, if press line 2 runs the B‑pillar Thursday at 07:00.Yes, if press line 2 runs the B‑pillar on Thursday at 07:00, ahead of the cross member. The assemblies leave welding cell 3 at 16:00 and every other call-off stays on time.
Press line 2
B‑pillar LH/RHCross member
07:0011:0015:00
Draft v124 operations changedReview the draft
Illustrative example: Zen reports that the customer pulled Friday’s B‑pillar call-off forward to Thursday and that the active plan would miss Thursday’s truck. The planner asks whether the plant can still make it, and Zen confirms it can if press line 2 runs the B‑pillar first on Thursday at 07:00.
Each disruption shows up in your costs. When a call-off moves, a machine stops or a shift changes.
Zentio works alongside your ERP and reads machine states from your MES or straight from the machines. A changed call-off and a stopped machine reach the same plan.
Planning and scheduling
Call-offs change after the plan is out.
Customers change quantities and dates every day. Your planners rework the sequence in Excel, and a missed truck means premium freight.
When a call-off changes, the scheduling agent drafts a new sequence and shows every order and changeover that moves. Your planners approve the draft before anything changes on the floor.
Planning hears about stops and scrap only at shift handover.
By then, stock for the next truck is already running short. The shift logs the stop reason late or not at all.
When a machine stops, its terminal asks why, and operators record good parts and scrap as they go. The scheduling agent drafts a new sequence for the shift lead while the shift can still act.
Setup know-how lives in a few setup technicians’ heads.
The settings that work for each tool are rarely written down. When those setup technicians are off shift, changeovers take longer and produce more scrap.
Zentio links setup sheets and the rules your setup technicians confirm to each machine, tool and part. The scheduling agent plans with them, and the next shift finds them at the terminal.
Follow one call-off change through the plant. From Thursday’s new sequence to the extra shift on Saturday.
Resequences the press line when a call-off moves.
The customer pulls Friday’s B‑pillar call-off forward to Thursday. The scheduling agent places it first on press line 2, moves the cross member behind it and saves the plan as draft v12.
Dies and material checked before each run
Every moved run shown before you commit
Active plan kept until your planner approves the draft
v12 · Thu, 08 Oct
060810121416
Press line 2B‑pillar LH/RHCross member
Welding cell 3Seat frameB‑pillar assembly
Staffs the extra Saturday shift with qualified people.
The short Thursday run ships part of the call-off from B‑pillar safety stock, so your planner adds a Saturday early shift on press line 2 to rebuild it. Zentio checks each person against the qualification matrix and proposes replacements.
Premiums priced with your pay grades before you confirm
Lapsed qualifications flagged before the roster goes out
Qualification history kept for your IATF 16949 audits
Sat, 10 Oct · Early shiftPress line 2
Setup technicianCovered
Press operatorProposed
Quality inspectorNeeds replacement
Forklift operatorAt limit
The Agentic Twin: your plant, from raw material to call-off. A stop logged at one machine reaches the plan and the shop floor screens at once.
At the core of Zentio sits the Agentic Twin, a dynamic model of your machines, tools, people, materials and call-offs. Specialist agents work from it to plan the lines, staff the shifts and show months ahead where ramp-ups and run-outs leave capacity short or idle.
Agentic TwinMachines and cellsTools and fixturesSetup technicians and operatorsMaterials and partsCall-offsKnowledge graph
Specialist agents
Ask Zen
Your team
Your team
Planners, shift leads and operators set the rules and make the decisions Zen brings to them.
Ask Zen
Zen answers questions, handles routine work within the rules you set and asks your team for every decision beyond them.
Specialist agents
They do the work behind each answer: scheduling, scenarios, staffing or master data.
Agentic Twin
It holds everything from machine states to the rules your team confirms.
Your systems
Your ERP, MES, machines and Excel files stay in place and feed the Agentic Twin with orders, routings and machine states.
Three steps, repeated with every change.
Each pass leaves the Agentic Twin more precise.
01
Understand
Zen reads the Agentic Twin to show what changed, which delivery dates are at risk and where you lose time and capacity. Each answer keeps recorded facts apart from assumptions.
Zen · Agentic Twin
02
Decide
The agents compare your options with their cost, test each one against likely disruptions and draft the next move for your team to approve.
Specialist agents · Your team
03
Learn
Stop reasons, actual times and the rules your team confirms flow back into the Agentic Twin. The master data agent proposes new planned times when the actuals drift.
Master data agent · Knowledge graph
Questions from plants like yours.
How do our call-offs reach Zentio?
Through your ERP. Zentio reads orders, routings and resources from systems such as SAP, PSI, Infor and Proalpha. During your evaluation, we confirm the route for your scheduling agreements and call-offs, whether they arrive as VDA or EDIFACT messages or through a customer portal.
Does Zentio replace our ERP or MES?
No. Zentio reads orders and machine states from them and adds terminals and shop floor screens where your team needs them. Your planners approve every change, and Zentio writes back to your systems only along a path you agree on with us.
Where does Zentio stand on TISAX, where is our data hosted and which AI models can we use?
The TISAX assessment and ISO 27001 certification are in progress. Zentio stores your data in Germany, or in another region if you prefer, and is GDPR compliant. Zentio works with all common large language models, or with one you host yourself. Your data is never used to train the models. Ask our team for current documentation and data-handling terms.
Where do we start?
With one operational question, such as what a higher or lower call-off means for your bottleneck. We work with your own orders, routings, resources and shift calendars.